Update home authored by Cornelis Bouter's avatar Cornelis Bouter
...@@ -6,6 +6,17 @@ This deliverable introduces the ontologies that have been developed in the conte ...@@ -6,6 +6,17 @@ This deliverable introduces the ontologies that have been developed in the conte
Table 1 – ***Prefixes and namespaces*** of the InterConnect ontologies Table 1 – ***Prefixes and namespaces*** of the InterConnect ontologies
***Individual pages*** of the Interconnect ontologies
1. [Datapoint, Timeseries and Message (ic-data)](ic-data)
2. [Forecast (ic-fc)](ic-fc)
3. [Incentive Table (ic-inc)](ic-inc)
4. [Power Limit (ic-pwlm)](ic-pwlm)
5. [User (ic-user)](ic-user)
6. [Flexibility (ic-flex)](ic-flex)
7. [Units of Measure (ic-uom)](ic-uom)
8. [Topology (ic-tplg)](ic-tplg)
9. [Device and sensor (ic-dev)](ic-dev)
| Prefix | Namespace | Main concepts | | Prefix | Namespace | Main concepts |
|---------|------------------------------------------------------|-----------------------------------------------------------------------------------------------------| |---------|------------------------------------------------------|-----------------------------------------------------------------------------------------------------|
| ic-data | http://ontology.tno.nl/interconnect/datapoint# | Datapoint, TimeSeries, Message, Utility Purpose | | ic-data | http://ontology.tno.nl/interconnect/datapoint# | Datapoint, TimeSeries, Message, Utility Purpose |
...@@ -33,16 +44,6 @@ Table 2 – ***Prefixes and namespaces*** of the *external* ontologies reused by ...@@ -33,16 +44,6 @@ Table 2 – ***Prefixes and namespaces*** of the *external* ontologies reused by
| s4ener | https://saref.etsi.org/saref4city/ | Facility, Administrative Area, City Object | | s4ener | https://saref.etsi.org/saref4city/ | Facility, Administrative Area, City Object |
| time | http://www.w3.org/2006/time# | Instant, Interval, Duration | | time | http://www.w3.org/2006/time# | Instant, Interval, Duration |
Links to the individual pages of the Interconnect ontologies
1. [Datapoint, Timeseries and Message (ic-data)](ic-data)
2. [Forecast (ic-fc)](ic-fc)
3. [Incentive Table (ic-inc)](ic-inc)
4. [Power Limit (ic-pwlm)](ic-pwlm)
5. [User (ic-user)](ic-user)
6. [Flexibility (ic-flex)](ic-flex)
7. [Units of Measure (ic-uom)](ic-uom)
8. [Topology (ic-tplg)](ic-tplg)
9. [Device and sensor (ic-dev)](ic-dev)